Sequence Timing and Delays
Campaigns
This guide explains how delays between sequence steps work in Reachkit.
Setting Delays
When you add steps to your sequence, each step has a delay field. This sets the minimum number of days to wait before sending the next step.
For example, if Step 1 has a delay of 3 days, Reachkit will wait at least 3 days after sending Step 1 before sending Step 2.
The minimum delay is 1 day.
How Delays Interact with Your Schedule
Delays are in calendar days, but emails only send during your scheduled sending windows.
If a delay ends on a day outside your schedule, the email waits until the next scheduled day. For example:
- Your schedule is set to weekdays only (Monday-Friday)
- You set a 2-day delay
- Step 1 sends on Thursday
- 2 calendar days later is Saturday
- Since Saturday isn’t in your schedule, Step 2 sends on Monday instead
This means your leads won’t receive emails outside your configured sending times, even if the delay technically ends on those days.